Jump to content

Use Phonak Classroom Speakers: Difference between revisions

Removed bullet point about completing campus installations during Summer of 2022.
No edit summary
(Removed bullet point about completing campus installations during Summer of 2022.)
Line 15: Line 15:
*Over the summer of 2019, systems were installed in all classrooms in Hackett Hall, in the Mayo Lab, and in room 5101 in the Science Annex.
*Over the summer of 2019, systems were installed in all classrooms in Hackett Hall, in the Mayo Lab, and in room 5101 in the Science Annex.
*Over the summer of 2021, systems were installed in all Mow classrooms, the 9/10 building basement and first floor classrooms, (with one exception,) and in two remaining classrooms in the Science Annex.
*Over the summer of 2021, systems were installed in all Mow classrooms, the 9/10 building basement and first floor classrooms, (with one exception,) and in two remaining classrooms in the Science Annex.
*We anticipate installing Phonak systems in all remaining classrooms over the next school year, to be completed during the summer of 2022.


==Instructions on how to use the Phonak System==
==Instructions on how to use the Phonak System==
309

edits