309
edits
No edit summary |
(Removed bullet point about completing campus installations during Summer of 2022.) |
||
Line 15: | Line 15: | ||
*Over the summer of 2019, systems were installed in all classrooms in Hackett Hall, in the Mayo Lab, and in room 5101 in the Science Annex. | *Over the summer of 2019, systems were installed in all classrooms in Hackett Hall, in the Mayo Lab, and in room 5101 in the Science Annex. | ||
*Over the summer of 2021, systems were installed in all Mow classrooms, the 9/10 building basement and first floor classrooms, (with one exception,) and in two remaining classrooms in the Science Annex. | *Over the summer of 2021, systems were installed in all Mow classrooms, the 9/10 building basement and first floor classrooms, (with one exception,) and in two remaining classrooms in the Science Annex. | ||
==Instructions on how to use the Phonak System== | ==Instructions on how to use the Phonak System== |
edits