Jump to content

Use Phonak Classroom Speakers: Difference between revisions

Removed bullet point about completing campus installations during Summer of 2022.
No edit summary
(Removed bullet point about completing campus installations during Summer of 2022.)
(One intermediate revision by the same user not shown)
Line 7: Line 7:
  | cat2          = Classroom Technology and Systems‏‎
  | cat2          = Classroom Technology and Systems‏‎
  | maintained    = DIS
  | maintained    = DIS
  | year          = 2021-2022
  | year          = 2022-2023
}}
}}


Line 15: Line 15:
*Over the summer of 2019, systems were installed in all classrooms in Hackett Hall, in the Mayo Lab, and in room 5101 in the Science Annex.
*Over the summer of 2019, systems were installed in all classrooms in Hackett Hall, in the Mayo Lab, and in room 5101 in the Science Annex.
*Over the summer of 2021, systems were installed in all Mow classrooms, the 9/10 building basement and first floor classrooms, (with one exception,) and in two remaining classrooms in the Science Annex.
*Over the summer of 2021, systems were installed in all Mow classrooms, the 9/10 building basement and first floor classrooms, (with one exception,) and in two remaining classrooms in the Science Annex.
*We anticipate installing Phonak systems in all remaining classrooms over the next school year, to be completed during the summer of 2022.


==Instructions on how to use the Phonak System==
==Instructions on how to use the Phonak System==
293

edits